Casa Verde Baterii 2026, the AFM program for prosumers

AFM pays up to 15,000 lei from the battery for energy storage

Do you have photovoltaic panels and a prosumer contract? Add a storage system of at least 10 kWh, with up to 75% of the cost covered by the Environmental Fund Administration. With ELSACO systems you pay from 7,000 lei, and you calculate your score right here.

Registration: November 20, 10:00 AM – November 25, 2026, 11:59 PM in the AFM application

How much do you get?

Up to 75% of the project value, but a maximum of 15,000 lei including VAT. The money goes directly to the installer; you only pay the difference.

What is being financed?

The storage system, installation, commissioning and related VAT, for a new battery of at least 10 kWh.

What do you pay?

The difference between the price of the system and the amount from the AFM. With ELSACO systems, from 7,000 lei.

How to choose files

By score, within the session budget. Registration time only counts in the event of a perfect tie, as the final criterion.

ELSACO BESS 16 kWh integrated systems

The battery capacity is above the 15 kWh threshold, so I take the maximum 40 points for the battery capacity criterion.

The battery in ELSACO systems

  • Lithium-iron-phosphate (LiFePO4) technology
  • 8,000 cycles
  • The system provides back-up
  • Monitoring from the smartphone app
  • Integrated fire extinguishing system
  • Outdoor/indoor installation: protection class IP65
  • Operating range: −20…60 °C
  • Integrated heating
  • 5 year warranty

Don't know if you have a single-phase or three-phase electrical network? Send us a picture of the meter on pv@elsaco-solutions.com and we tell you.

HUAWEI batteries, if you have a HUAWEI hybrid inverter installed

The prices include Huawei Smart Guard. For these batteries, your contribution exceeds the amount from AFM anyway, so you get the maximum contribution from the start.

Prices include VAT. Offer valid for 30 days. The scores shown assume that you have not previously received public funding for a battery.

Calculate your score

You choose the system, then move the slider to see how the score changes depending on how much you pay. We use the formulas from the guide approved by Order 1.904/2026, amended by Order 2.314/2026. The result is indicative: the official score is calculated by the AFM application.

Choose the system
Have you ever received public money for a battery? Any national or European funding for a storage system counts. Funding just for panels does not count. Did you get the Green Photovoltaic House with battery? See the frequently asked questions.

Your contribution

––
?out of 100
–contribution / 35
–capacity / 40
?financing / 25
  • System price, including VAT–
  • Funding from AFM–
  • You pay.–
    I want this system

    The button opens your email application with the completed simulation. We will contact you for the offer and preparation of the file.

    How the score is calculated

    The score is calculated from what you declare in the funding application. Three criteria, summed up:

    • For the criterion: Your contribution – maximum 35 points

      35 points are obtained when you pay at least what you ask from AFM.

    • For the criterion: Battery capacity – maximum 40 points

      Between 10 kWh (20 points) and 15 kWh (40 points); 40 points for 15 kWh or more.

    • For the criterion: With/without previous financing for the battery – 25 points

      If you did not receive public money for a storage system, you receive 25 points.

    On equal points wins, in turn: the higher contribution in lei, the higher capacity, the lack of previous funding, then the time of registration.

    ELSACO systems, in two versions
    System and variantAFMYoupuncture

    Amounts in lei including VAT; the scores assume that you have not received any funding for batteries. Between the two options, you can choose any contribution; the score increases with it.

    Three things to know before you sign up

    We often see them wrong and they can cost funding.

    Don't buy anything before approval

    AFM only reimburses expenses incurred after financing approval. A battery installed now cannot be financed through this session.

    Only state what you can support.

    During installation, the contribution and capacity can be higher than you declared, but not lower. If they decrease and the score would be lower, AFM will not reimburse the project.

    Upload documents in their original format

    Electronically issued certificates are uploaded exactly as you received them, not scanned or photographed. Once uploaded, you cannot replace them; you can only withdraw the file and submit another one until the session closes.

    Are you eligible?

    The conditions in the financing guide, in brief. We will help you with the technical verification.

    You, as an applicant

    • You are a natural person and a prosumer, with a prosumer contract in your name.
    • You do not carry out economic or professional activities at the place of consumption, or their consumption is metered separately.
    • You have no debts to the state budget and to your home city hall or to the project address.
    • You have not received and will not request other public funding for the same expenses.
    • You only sign up once per session, for a single storage system.

    Storage system

    • New, with a capacity of at least 10 kWh.
    • Li-Ion, LiFePO4, Na-Ion or equivalent, lead-free technology.
    • Minimum 5-year warranty and minimum 5,000 charge-discharge cycles.
    • BMS that monitors temperature, voltage and currents and can limit or stop charging.
    • Components certified by an accredited body according to SR EN ISO/IEC 17065.
    • It automatically charges from the surplus panels and serves only your consumption location.

    Documents for the file

    Check what you already have. All must be valid at the time of registration and issued in your name.

    0 out of 8

    prepared documents.

    You create your account in the AFM app before November 20th, so that on the first day you only have to upload.

    Not sure about a document? Send it to us. pv@elsaco-solutions.com and we'll tell you if it's okay before you upload it.

    From registration to battery installed

    You sign up with your account. After approval, you choose us as your installer and we take care of the rest.

    1. You create an account in the AFM app

      Ahead of time, before the opening of the session.
    2. Prepare the documents

      The eight above, in original electronic format.
    3. You register between November 20 and 25

      You declare your contribution, capacity and previous funding; you receive a registration number.
    4. AFM orders the files

      After scoring, within budget. Requested clarifications are sent within 5 days.
    5. Choose ELSACO Solutions

      In the AFM application, no later than 90 days from the publication of the list.
    6. We install the system

      Including updating the connection certificate. You only pay your contribution.
    7. AFM settles

      Pay the rest directly to the installer. There will be a year of monitoring.

    Talk to an ELSACO consultant

    We help you choose the right system for your home and check your documents before registration, so that the file is entered correctly the first time.

    ELSACO Solutions is part of the ELSACO group and has been installing photovoltaic systems throughout the country since 2019, including through the AFM Casa Verde programs.

    Frequently asked questions

    I already have a battery. Can I apply?

    Yes, if the system you are requesting money for is new and distinct from the existing one. If the current battery was paid for with public funds, you receive 0 points under the previous funding criterion; if you bought it with your own money, you receive 25.

    I bought Casa Verde Photovoltaice. Do I lose the points?

    The guide gives 0 points on this criterion to those who received public money „for the purchase and installation” of a storage system. If your funding only covered the panels, this is not the case. If it also included a battery, there is a risk that the AFM will consider it as previous funding for storage. The declaration is at your own risk, so if you are not sure, ask for clarification from the AFM before registering or call us to look at the documents together.

    Single-phase or three-phase, which one do I choose?

    The one that corresponds to your home's electrical network. Both ELSACO systems have the same 16 kWh battery and the same capacity rating. If you don't know what connection you have, send us a picture of the meter and we'll tell you.

    Which financing option should I choose?

    With the maximum AFM funding you pay the least, but you have a lower score. If you ask for less from AFM and pay what you receive from AFM, you get the maximum score on your contribution. The higher the score, the more chances you have to get into the session budget.

    What is the maximum amount I can request from AFM?

    The lowest of three amounts: 15,000 lei, 75% of the total project value and the eligible cost of storage, capped at 1,500 lei/kWh including VAT. For all systems on this page, the maximum is 15,000 lei. You can ask for even less to increase your score.

    What is the minimum score to receive the money?

    It is not known in advance. AFM orders the files by score and approves within the session budget, so the threshold results after registration closes.

    Will I receive the money in my account?

    No. After approval, you choose a validated installer, who issues you an invoice with the amount borne by AFM separately mentioned. AFM pays this amount to the installer, and you only pay your contribution.

    How much time do I have after approval?

    90 days to choose the installer in the application and 12 months for installation and commissioning, with the possibility of extension to 18 months if the connection certificate update was requested on time.

    The projects are carried out through the Program for the installation of electricity storage systems produced from renewable sources, in order to accumulate the necessary energy for own consumption and deliver the energy surplus to the national grid, carried out by AFM and financed from the Environmental Fund.

    The simulation on this page is indicative and does not confirm eligibility, equipment compatibility or the granting of funding. The official score is calculated by the AFM application. Sources: Financing Guide approved by Order of the Ministry of Agriculture, Food and Rural Affairs no. 1,904/2026 (Official Gazette no. 775 of 14.09.2026), amended by Order no. 2,314/2026 (Official Gazette no. 953 of 16.11.2026); official information on afm.ro. Updated on November 18, 2026.

    ELSACO Solutions SRL, part of the ELSACO group. solutions.elsaco.com